Non Disclosure Agreement
This is the Non Disclosure Agreement for the Bakeoff. This document must be signed by all participants prior to testing.
[ HTML ] [ Word ]
Press Release
Click here to view.
Bakeoff Planning
- Topic: VPIM Bakeoff Opening Call
- Date: August 17, 2000
Bakeoff Goals
- confirmation of interoperability of all features of VPIM v2 (RFC 2421) to allow promotion to Draft Standard
- confirmation of clarifying aspects of VPIM v2 r2 (draft-ietf-vpim-vpimv2r2-00.txt)
- a forum to allow numerous vendors perform interop testing with each other simultaneously
- publish declaration of compatibility and interoperability from all testing vendors on the VPIM website
- this is NOT a marketing event
- this is NOT a VPIM directory test
Logistics
- Each vendor must have 1 (maximum 3) test engineers at the test facility for the duration of the tests. This will speed up the testing process and allow easy discussion of problems (should they occur :-)
- Each vendor to bring VPIM v2 equipment OR facility to access equipment. If the latter, VPIM v2 equipment MUST be outside a firewall on the public Internet
- Testing based on EMA VPIM Test Plan
- Nominal entry costs may be collected by EMA to go towards facility costs
Location & Time
- Hosted by Nortel Networks at innovations.lab test facility.
- 600 Technology Park
Billerica, MA 01821
First floor, south side
Lab 1S-90
- August 17-18, 2000
- Hotel Information
- Wyndham Billerica
270 Concord Road
Billerica, Massachusetts 01821
Phone: +1-978-670-7500
Fax: +1-978-670-8898
- Click here for directions from Logan International Airport to the hotel on MapQuest.
Click here for directions from the hotel to the innovations.lab.
(Note: MapQuest illustrates a long distance from the hotel to the lab, but it should be possible to walk across the parking lot to get to the innovations building.)
Test Plan
- An overview of the VPIM testing plan here.
- Submit a declaration of your products feature support using the Auto Declarations page before the event.
List of Participants
(List of Contacts)
Nortel Networks
- CallPilot
- Meridian Mail Net Gateway
- Norstar Voice Mail
Comverse Networks
Glenayre
Lucent/Avaya
Microsoft
Closing Discussion Information
At the end of the bakeoff a short meeting was held for participants to summarize the successes of the event and review any actions (including result postings and reviewing press announcements).
- Topic: VPIM Bakeoff Conclusions and Actions Call
- Date: August 18, 2000
- Location: Nortel Networks Innovations Lab
I want to join the VPIM EMA mailing list!
|