Austin/25 Report of the Revision Study Group SEC N763 Page 1 of 1 Submitted by Andrew Josey, The Open Group. April 15th, 1999 The study group met twice with the Austin Group during the last six months (Sept 1998, and March 1999). The group has developed the long scope, outline schedule, draft document development procedures and generated editing directions for production of a baseline draft 1. A PAR submission has been prepared for approval by the PASC SEC at the meeting.